Infrastructure projects are prepared by Proses Engineering and coordinated by Dinamik Proje Engineering.

Some Official Establishment Projects:

● Wastewater and Rainwater Project Services

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ 327km wastewater and rainwater network and collectors.
○ 193km rainwater network and collectors.
○ 131.49km preparation of floot risk maps for creeks
○ 37,40 km Creek projects.
○ 168,89 km creek mapping works.
○ 16km expropriation project preparation and getting approval.
○ 6km wastewater tunnel project.
○ 2 unit GRID Chamber Project.

[/r6_col][/r6_row]
ISKI (ISTANBUL WATER AND SEWERAGE ADMINISTRATION) 2011 – 2014


● Preparation of the Feasibility Reports for Wastewater Treatment Centers in Various Catchment Areas

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ Preparation of the feasibility reports of the (9) progressed Biological Treatment centers and Preparation of the environmental İmpact Evaluation report.

[/r6_col][/r6_row]
ISKI (ISTANBUL WATER AND SEWERAGE ADMINISTRATION) 2009 – 2011


● Denizli City Feasibility Studies

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

Feasibility Studies for Water Supply & Distribution System, Sewerage System and Storm Water System. Analysis of the existing networks, determination of the improvements to be made to minimiize the existing water losses and to meet the future demands; preparation of the investment plan and cash-flow tables.

[/r6_col][/r6_row]
2005


● Izmir City Water Network

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

Design of numerous Water Distribution Systems of different pressure zones.

[/r6_col][/r6_row]
1988 – 1989


● Project Technical Specification Revision Works for Hydroulic Channels

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ Preparation of spesification for wastewater, Channalisation network and collectors.
○ Preparation of Technical specification for Creek Treatment (Regarding the width and the height). Specification for Super structures.
○ Design Works for every group of (Wastewater, Rainwater systems ,Creek treatment ). Tipical crosssections and details.
○ Preparation of the technical specification for expropriation, Mapping, Project submittion and revisional works.

[/r6_col][/r6_row]
ISKI (ISTANBUL WATER AND SEWERAGE ADMINISTRATION) 2008 – 2009


● In Some Parts of Asian Side of the City, Wastewater-Stormwater Lateral and Collector Systems, Creek Rehabilitation Design Works

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ Design Works for Wastewater network and collectors. 768,59km.
○ Designworks for the rainwater network system and collectors. 135,67km.
○ Creek projects. 127,81km.
○ Field İnvestigation and mapping Works for Expropriation. 127,81km.
○ Wastewater Tunnel Project. 5,85km.

[/r6_col][/r6_row]
ISKI (ISTANBUL WATER AND SEWERAGE ADMINISTRATION) 2005 – 2008


● BURSA Wastewater Project Controlling And Consulting Works (KMH-1)

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ Wastewater network and collectors. 537,28 km (Ø200-Ø300).
○ Wastewater tunnel application plan works. 11,03 km (Ø2000-Ø2400).
○ Rainwater network and collectors. 414.45 km (Ø300-Ø3000).
○ Wastewater pumping centerapplication projects. 10 m³/sn.
○ 19 unit creek line walls statical calculations.

[/r6_col][/r6_row]
BUSKI (BURSA WATER AND SEWERAGE ADMINISTRATION) 2006 – 2007


● In some parts of Europe Side, Wastewater-Stormwater Lateral and Collection systems, Creek Rehabilitation

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ Wastewater network and collectors. 1.556,24 km.
○ Rainwater network systems and collectors. 528,37 km.
○ Creek projects. 146,50km.
○ Creek mapping Works. 146,50 km.
○ Preparation of expropriation plans. 1.273.936,54 m2
○ 23.17 km Wastewater and 4.48 km sea water tunnels. 23,17 km.
○ Wastewater pomping center, application project. 400 Kw (2+1), 9 Kw (1+1).

[/r6_col][/r6_row]
ISKI (ISTANBUL WATER AND SEWERAGE ADMINISTRATION) 2005 – 2008


● Rehabilitation of Creek and Preparing Services of Wastewater-Stormwater Collection Sytems of Creeks’ Project and Measurement Work

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ 537,28 km (Ø200-Ø300) wastewater network collector systems.
○ 11,03 km (Ø2000-Ø2400) Wastewater Tunnel application Project.
○ 414.45 km (Ø300-Ø3000) Rainwater network collector systems.
○ 175 km road preliminary and final projects.
○ 19 unit creek line walls statical calculations.
○ Preparation of expropriation plans. 69,71km.
○ 382,84 ha Preparation of the design and reports for Landscaping.Estimated cost and unit account.
○ Preparation of the application Projects and also the bidding documents for TUZLA Biological Advanced wastewater treatment system center which has 225.000m3/day capacity, and the Hydroulic-electrical-mechanical and structural application projects for antrence pomping center (1.section,2.Stage,75.000m3/day capacitated).

[/r6_col][/r6_row]
ISKI (ISTANBUL WATER AND SEWERAGE ADMINISTRATION) 2001 – 2005


● South Haliç Catchment (1. Part) Wastewater and Stormwater Application Projects and Measurement Preparing Services Work Control

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ 2.283,10 km (Ø200-Ø2800), 11,03 km (Ø2000-Ø2400) wastewater network and collectors.
○ 4,5 km (Ø4800) Wastewater tunnel project.
○ 911,63 km (Ø200-Ø2800) Rainwater network and collectors.
○ 10,55 km Creek treatment and rectangle cross-section application.
○ Preparing 1 Unit wastewater pumping center,preliminary and application Project (300.000 persons).

[/r6_col][/r6_row]
ISKI (ISTANBUL WATER AND SEWERAGE ADMINISTRATION) 1999 – 2002


Some Abroad Design Works:


● New Asgabat Airport – Asgabat(TURKMENİSTAN)

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ Title of Project: Airport
○ Location: Asgabat-Turkmenistan
○ Area: 108.754 m²
○ Construction Area: 350.000 m²
○ 2.300.000 m2 Air pist for
○ 17.000.000 passenger capacity
○ Design Works: Wastewater, Drainage, Gallery, Potable water, Hydrant application projects.

[/r6_col][/r6_row]
POLIMEKS A.S. – 2014


● Olympic Games Village Phase 2 – Asgabat(TURKMENİSTAN)

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ Title of Project: Olympic Games Village Phase 2
○ Location: Asgabat-Turkmenistan
○ Area: 108.754 m²
○ Construction Area: 655.357 m²
○ Design Works: Road, Wastewater, Gallery, Rainwater, Potable water, Drainage, Hydrant, Duker, Depot Application projects.

[/r6_col][/r6_row]
POLIMEKS A.S. – 2014


● Baku – Azerbaycan (AZEBAIJAN)

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ Title of Project: Bilgeh, Nardaran, Kurdexani, Pirsagi Potable water systemprojects.
○ Location: Azerbaycan
○ Quantity of Work: 295km.
○ Design Works: Preparation of potable water application projects.

[/r6_col][/r6_row]
POLIMEKS A.S. – 2014


● Baku – Azerbaycan (AZEBAIJAN)

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ Title of Project: Buzovna Channalisation system projects
○ Location: Azerbaycan
○ Quantity of Work: 242 km.
○ Design Works: Wastewater systems application projects.

[/r6_col][/r6_row]
POLIMEKS A.S. – 2014


● Baku – Azerbaycan (AZEBAIJAN)

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ Title of Project: Bilgeh, Nardaran, Kurdexani, Pirsagi Potable water systemprojects.
○ Location: Azerbaycan
○ Quantity of Work: 295km.
○ Design Works: Preparation of potable water application projects.

[/r6_col][/r6_row]
CBMC – 2012


Some Transportation – Highway Design Works:


● Istanbul Finance Center, Road-Intersection-Interchange Application Project

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ Road: 12.2km.
○ Structure: 3,200 m2;
○ Bridge: 1850m Retaining Wall
○ Soil İnvestigation Reports
○ Infrastructure application plans.

[/r6_col][/r6_row]
EMLAK KONUT GYO A.S.


● Istinye Park SC Entrance – Exit Joint and Adjacent Roads Project

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ Road: 6.5km
○ Structure
○ Infrastructure application plans.

[/r6_col][/r6_row]
ORJIN & DOGUS GYO


● Hosdere Village, Municipal Road Application Project

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ Road: 12.5km
○ Structure: 1126m
○ Preparation of Alteration Plans
○ Soil İnvestigation Reports
○ Infrastructure application plans.

[/r6_col][/r6_row]
EMLAK KONUT GYO A.S.


● Mall Of İstanbul

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ Road: 6.5km
○ Structure: 3,90 m2
○ Bridge: 550m. Retaining wall
○ Soil İnvestigation Reports
○ Infrastructure application plans.

[/r6_col][/r6_row]
TORUNLAR GYO A.S.


● Silivri Sanatkarlar Street-D100 Crossing, Overpass, Road, Junction Application Project

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ Road: 11.7km
○ Structure: 3500m²
○ Preparation of Expropriation Plans
○ Preparation of Alteration Plans
○ Preparation of İnfrastructure Application Projects
○ Approved By General Directorate of Highways and 1.Division Directrorate of Highways.

[/r6_col][/r6_row]
Metropolitan City Municipality Transportation and Planning Department


● Sariyer – Cayirbasi Highway Tunnel Connection Road and Junction (Cayirbasi connection road junction)

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ Road: 4.2km
○ Preparation of Expropriation Plans
○ Preparation of Alteration Plans
○ Cayirbasi Koz creek,Treatment project
○ Preparation of İnfrastructure Application Projects.

[/r6_col][/r6_row]
OZTAS A.S.


● Seyrantepe-TEM Highway Overpass/Underpass Junction Preparation of Preliminary and Application Projects

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ Road: 5.8km
○ Structure : 1400m²
○ Preparation of Expropriation Plans
○ Preparation of Alteration Plans
○ Preparation of İnfrastructure Application Projects
○ Getting The Approval of Genaral Directorate of Highways.

[/r6_col][/r6_row]
Metropolitan City Municipality Transportation and Planning Department


● SAF GYO – Akasya Acibadem, Road PROJECT

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ Road: 6km
○ Preparation of Expropriation Plans
○ Preparation of Alteration Plans
○ Animation
○ Preparation of scale model
○ Getting UTK Licence From İBB For The Construction Road Connection.

[/r6_col][/r6_row]
Metropolitan City Municipality Transportation and Planning Department


● Kuçukçekmece, D100 Çobançeşme Junction, Olimpiyad Road, İntersection, Interchange Application Projects

[r6_row][r6_col n=“4″][/r6_col]
[r6_col n=“7″]

○ Road: 9.5km
○ Preparation of Expropriation Plans
○ Preparation of Alteration Plans .

[/r6_col][/r6_row]
Metropolitan City Municipality Transportation and Planning Department